An athletic polo has to do two things a business polo does not: allow full range of motion and deal with sweat. This polo is cut with a higher armhole, a gusseted underarm option and side vents, in a quick-dry knit that moves moisture away from the skin instead of holding it.
| Fabric | Quick-dry performance knit, 150-190gsm (poly / poly-blend) |
|---|---|
| Construction | Set-in or raglan sleeve, gusseted underarm option, side vents |
| Placket | 3-button or 2-button athletic placket |
| Collar | Knit collar with stay, or self-fabric stand collar option |
| Fit | Athletic taper, unisex S-3XL |
| Decoration | Embroidery, transfer print, heat-seal names and numbers |
| Labelling | Custom wash tags, neck label, size label, hang tag, packaging bag |
| MOQ / Sampling | 50 pcs / 7-day sampling, 15-25 days bulk |
Sportswear gets washed more often and at higher temperatures than a business polo. We write the wash tags for that reality — temperature, drying and any performance-finish care — so your customers do not destroy the quick-dry properties in the first month.
FAQ
Q: What is the difference between this athletic polo and your performance golf polo?
A: This page uses an athletic taper with a higher armhole and side vents for training and court sports; the golf polo is cut for a swing with a stay-collar and gusseted underarm as standard.
Q: Can you add names and numbers for a team?
A: Yes. Heat-seal or embroidered names and numbers can be applied per garment with individual packing.
Q: Do the wash tags matter for performance fabric?
A: Yes. Quick-dry and performance finishes degrade if washed incorrectly, so we write care instructions for your specific finish.
Q: Do you offer raglan as well as set-in sleeves?
A: Yes. Raglan gives more shoulder freedom for throwing and swinging sports; set-in gives a cleaner shoulder line. Both are produced on the same body.
Q: Which weight do you recommend for training?
A: 150-190gsm performance knit. Lighter than that loses structure; heavier holds sweat and slows drying.
Q: Do you apply a moisture-management finish?
A: Yes, on poly and poly-blend bodies. Send your requirement and we confirm it on the sample rather than describing a finish we have not applied.
Q: What is the MOQ and lead time?
A: 50 pcs per colour and design, 7-day sampling, 15-25 days bulk production after approval.